Skip Navigation

Southern

Departures
Arrivals
There are also planned engineering works for today Check before travelling
Last updated: 10:08

Journey Types
Travel Dates
Outbound
Outbound
Today
Dep
Return
Return
Today
Dep
Passengers

You cannot have more than 9 passengers

Railcards

You cannot have more railcards than passengers

Add a railcard

Train Service Updates

See if there is any service disruption on the Southern network, check live departures and arrivals from any station or find out about any alternative routes during unplanned disruption.

Check live departures or arrivals at any station

Departures

Planned engineering work for Today

Amended 00:01 London Bridge to Crystal Palace from Tuesday 21 to Friday 24 May

Date:
21 May - 24 May 2019 11:59 PM

Routes affected:
Between London Bridge and Crystal Palace

Engineering work is taking place between Streatham Hill and Beckenham Junction each morning between 00:01 and 05:00, closing some lines.

The 00:01 London Bridge to Crystal Palace is replaced by a bus throughout.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Replacement Bus Travel Advice:

Bicycles are not allowed on rail replacement bus services at any time, unless fully folded. More travel advice for your replacement bus journey is available by selecting the Train Operating Company you are travelling with here.

Buses replace late night / early morning trains between Guildford and Redhill from Monday 20 to Friday 24 May

Date:
20 May - 24 May 2019 11:59 PM

Routes affected:
Great Western Railway between Reading and Gatwick Airport Southern between London Victoria and Reigate

Engineering work is taking place between Gomshall and Redhill  overnight from Monday evening until Friday morning.

Great Western Railway

Monday to Thursday:

  • The 22:35 Reading to Gatwick Airport service will terminate at Guildford. A replacement bus will run between Guildford and Redhill, calling at all stations. Rail connections are available for Redhill to Gatwick Airport.
  • The 23:34 Reading to Gatwick Airport service will terminate at Guildford. A replacement bus will run between Guildford Gatwick Airport, calling at Dorking Deepdene, Reigate and setting down only at Redhill and Gatwick Airport.
  • The 23:18 Gatwick Airport to Reading will terminate at Redhill and restart at Guildford. Road transport will run from Redhill to Guildford, calling at Reigate and Dorking Deepdene. A later rail connection is available from Guildford, setting down only at North Camp, Blackwater and Wokingham.

Tuesday to Friday:

  • The 04:31 Reading to Gatwick Airport will depart Guildford at 05:35 and terminate at Redhill. Rail connections are available between Redhill and Gatwick Airport.
  • The 06:00 Gatwick Airport to Reading service will start from Redhill. Rail connections are available between Gatwick Airport and Redhill.

Southern

Buses will replace trains between Redhill and Reigate.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Replacement Bus Travel Advice:

Bicycles are not allowed on rail replacement bus services at any time, unless fully folded. More travel advice for your replacement bus journey is available by selecting the Train Operating Company you are travelling with here.

To check for future disruptions visit the planned engineering works page.

Other disruptions

4 Train formation updates

  • 09:39 Epsom Downs to London Victoria due 10:40

    Facilities on the 09:39 Epsom Downs to London Victoria due 10:40.
    This is due to more trains than usual needing repairs at the same time.
    Will be formed of 4 coaches instead of 8.

  • 09:50 Caterham to London Bridge due 10:34

    Facilities on the 09:50 Caterham to London Bridge due 10:34.
    Will be formed of 5 coaches instead of 10 from Caterham.

  • 10:47 London Bridge to Caterham due 11:28

    Facilities on the 10:47 London Bridge to Caterham due 11:28.
    Will be formed of 5 coaches instead of 10.

  • 11:00 London Victoria to Epsom Downs due 11:59

    Facilities on the 11:00 London Victoria to Epsom Downs due 11:59.
    Will be formed of 8 coaches.

0 Changes to train facilities

No incidents

1 Station updates

  • Salfords: Oyster Card Readers out of order

    The oyster card readers are out of order at Salfords station.

London underground